[1]. Owolabi James D, Amusan Lekan M, Oloke C. O, Olusanya O, Tunji- Olayeni P, OwolabiDele, PeterJoy; OmuhIgnatious, "causes and effect of delay on project Construction delivery time", International Journal of Education and Research, Vol. 2, pp. 4, April 2014.
[2]. Towhid Pourrostam, Amiruddin Ismail, "Causes and Effects of Delay in Iranian Construction Projects", IACSIT International Journal of Engineering and Technology, Vol. 4, pp. 5, October 2012.
[3]. Dennis L. Clason, Thomas J. Dormody, "Analyzing Data Measured by Individual Likert-Type Items", Journal of Agricultural Education, Vol. 35, pp. 31-35, May 2011.
[4]. James Dean Brown, "Likert items and scales of measurement", SHIKEN: JALT Testing & Evaluation SIG Newsletter, Vol.1, pp.10-14, March 2011.
[5]. Harry N. Boone, Deborah A. Boone, " Analyzing Likert Data", Journal of extension, Vol. 50, pp. 18, April 2012.
[6]. T. Phani Madhavi, Steve Varghese Mathew, Roy Sasidharan, " Material management in construction – a case study", IJRET: International Journal of Research in Engineering and Technology, pp. 400-403, November 2013.
[7]. Mr.A .A. Attar, Prof. A.K. Gupta, Prof.D.B.Desai, "A Study of Various Factors Affecting Labour Productivity and Methods to Improve It", IOSR Journal of Mechanical and Civil Engineering, Vol. 5, pp. 11-14, April 2012. A.J. Jeya Arthi, A.Hemamalinie, Dr L.Ramajeyam, " Applicable Legal Requirements in a Construction Site", International Journal of Emerging Technology and Advanced Engineering , Vol. 4, pp. 55-59, June 2014.
[8]. P. Goddosi, M. Hosseinalipour and M.P. Jalal, “Fuzzy Assessment of Causes of Time Overrun (Delays) in Iran’s Dam Construction Project”, journal of applied sciences,Vol.8, pp 3423-3430, April 2008.
[9]. Savita Sharma1 and Pradeep K. Goyal 2 “Cost Overrun Assessment Model in Fuzzy Environment”,American Journal of Engineering Research (AJER), Vol.03, pp 44-53,2014.
|